|









|


Setting Tube Sizes
This section involves the setup of tube sizes for
standards, ledgers, transoms, braces, and handrails.
To set up the tube sizes of your scaffolds, do the
following:
- From the Main page, press F5 or click on the Tubes button in the Optional
Setup For Scaffolding Specialists Only! Section.
The Set Up Tube Sizes
screen displays.
Click on the appropriate checkbox(es) for the options
you want for the estimations:
 | Use Double Standards |
 | Stagger Handrails |
 | Handrails at Outer Side Only |
 | Add Extra Transoms on Boarded Lifts Bracing |
3. Enter the Longer Size
and Shorter Size measurements for the following:
 | Tube Sizes for Standards |
 | Tube Sizes for Ledgers |
 | Tube Sizes for Transoms |
 | Main Handrails and Railstops |
 | Tube Sizes for Façade Braces (one size only) |
 | Tube Sizes for Ledger (one size only) |
 | Tube Sizes for Plan Braces (one size only) |
4. Enter values for Other
Default Data:
 | Yield Strength (N/m2) |
 | Tube E.I. Property (exp 6) |
 | Tube End Allowance (m.) |
|